Infrastructure

23.       STATUS OF INFRASTRUCTURE IN JNV’S

 

 

 

I

Area of land  allotted (in acres)

 

Whether land transferred in the Name of Samiti

 

Vidyalaya shifted to permanent buildings on

 

 

: 5986.03 Square Meter.

 

: YES

 

 

: YES

ii

Status of Boundary Wall

 

a.  Brick Wall

b.  Barbed wire fencing

 

 

: (Completed / Incomplete)

 

Incomplete

Incomplete

iii

Permanent buildings constructed

 

 

: CPWD pattern

iv

School building

 

 

 

: Incomplete

v

Dormitories

:  Boys ______143_____ Nos.

   with Warden Residence___4___ Nos.

 

 

 

:  Girls ______92______ Nos.

   with Warden Residence___2___ Nos.

 

vi

Kitchen/dining Hall

 

No. of shifts required for all students  to take food

 

 

:  Not complete, Area 410.511 Sqm.

 

 

 

vii

Principal Residence

 

 

:  _01_ No.

viii

Staff Quarters

 

 

 

 

: Type III = ___04___ Nos.

  Type II = ____08___ Nos.

  Type  I  = ____04__ Nos.

  SP Sheds converted into Staff Qrs.:_____ Nos.

ix

M.P. Hall

 

: Available / not available

x

Workshop

 

: Available / not available

xi

Type of O.H. Tank

 

Its capacity

 

Present Status

 

: Shaft type / Column based

 

:  1,00,000 Lack liters

 

: Working satisfactory / not satisfactory

xii

U.G. tank

 

Its capacity

 

Present Status

 

 

:  _______ liters

 

: Working satisfactory / not satisfactory

xiii

D.G. Set

 

 

 

 

Available / not available

: _____________ make

:   ______ KV

: Working / not working

: Year of procurement

 

xiv

Sewage Pump

 

: ________ H.P. / not available

 

xv

Water Pump

 

 

: ________ capacity / not available

xvi

Electrification

 

Electric connection

Sub Station building

Street lighting

 

Numbers of hrs. during day when power supply is available on an average.

 

 

 

 :  Rural / Urban Feeder

Complete/ Incomplete

: __________ Nos. of Poles

 

: ___24_____ hrs.

  

xvii

Playfields

 

400 meter track

40 x 30 meter basket ball court

40 x 30 meter volley ball court

 

 

 

: Available/ not available

_______Nos.   – Available / not available

_______Nos.   – Available / not available

 

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

 

 

 

: Potable,  ______ Nos.-  working / not working

: Potable, ______ Nos.-  working / not working

:  ___2___ hours supply in a day

xix

Rajiv Gandhi Smriti Van

 

:  Available / not available

xx

Fire fighting arrangement

 

:  Working / not working

xxi

Last date of cleaning of

(a)   Septic tank

(b)   Water tanks

 

:     25-5-2014

:     20-5-2014

xxii

Whether area around transformer is fenced

Yes  /  No

xxiii

Whether open wells, if any, are covered from top

:   Yes / No

xxiv

Works taken up under M&R fund during current year and last year:-

 

: Till date school building didn't hand over.

Year

Name of work  (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year

--

--

--

--